Home Our Business
PT Exploitasi Energi Indonesia has a concession area of 498.7 hectares and is located in Riam Andungan Village, District of Kintap, Tanah Laut Regency, South Kalimantan. The concession is approximately 180 km from the Banjarmasin.
Parameter | Unit | Result |
AD | ||
Total Moisture | % | – |
Inherent Moisture | % | 5.1 |
Ash Content | % | 13 |
Volatile Matter | % | 44,4 |
Fix Carbon | % | 37.8 |
Total Sulphur | % | 0.66 |
Caloric Value | Kcal/Kg | 6.325 |
PT Sekti Rahayu Indah has a concession area of 2.659 hectares and is located in Santilik dan Santiung Village, District of Mentaya Hulu, Regency of Kotawaringin Timur, Central Kalimantan. The concession is located approximately 180 km from the Sampit.
Resources Category 100 m Depth | ||||
Seam Name |
Measured |
Indicated |
Inferred |
Total (Tons) |
M | 237,870 | – | – | 237,870 |
L | 5,593,950 | 399,240 | 487,560 | 6,480,750 |
K | 3,457,110 | 402,380 | 411,400 | 4,270,890 |
J | 36,412,840 | 1,463,340 | 1,846,220 | 39,722,400 |
I | 15,080,160 | 1,033,530 | 1,315,600 | 17,429,290 |
H | 4,532,170 | 371,510 | 458,120 | 5,361,800 |
TOTAL | 65,314,100 | 3,670,000 | 4,518,900 | 73,503,000 |
Parameter | Unit | Result | |
AD | AR | ||
Total Moisture | % | – | 39.48 |
Moisture In Analysis Sample | % | 24.76 | – |
Ash Content | % | 8.45 | – |
Volatile Matter | % | 35.06 | – |
Fix Carbon | % | 31.53 | – |
Total Sulfur | % | 0.22 | – |
Caloric Value | Kcal/Kg | 4.357 | 3.503 |
PT Abe Jaya Perkasa has a concession area of 3.467 hectares and is located in, Kandul and Majangkan Village, District of Gunung Timang, Regency of Barito, Central Kalimantan. The concession is located approximately 150 km from the Palangkaraya.
Coal Resources (Metric Ton) | ||||
Seam Name |
Inferred (500-1000m) |
Indicated (250-500m) |
Measured (0-250m) |
Hypothetical |
VU | 844,688 | 2,594,066 | 6,451,777 | 11,601.422 |
VL | 825,578 | 2,384,344 | 5,970,000 | 10,779,924 |
U | 4,000,823 | 9,584,150 | 20,770,156 | 32,117,468 |
T | 5,335,496 | 11,554,835 | 23,737,162 | 34,221,216 |
S | 894,442 | 1,571,017 | 3,644,452 | 6,634,700 |
TOTAL | 11,901,027 | 27,688,412 | 60,573,547 | 95,354,730 |
Parameter | Unit | Result | |
AD | AR | ||
Total Moisture | % | – | 33.85 |
Moisture In Analysis Sample | % | 14.04 | – |
Ash Content | % | 5.2 | 4.00 |
Volatile Matter | % | 40.82 | 31.41 |
Fix Carbon | % | 39.94 | 30.74 |
Total Sulfur | % | 0.14 | 0.11 |
Caloric Value | Kcal/Kg | 5.575 | 4.290 |
Hardgrove Grindability Index | % | 52 | |
Particle Size – 50 mm | % | 7.99 | |
Particle Size – 50 mm | % | 92.01 |
Pangkalan Bun coal-fired power plant has a capacity of 14 MW which consists of 2×7 MW. The Plant is located near Kapitan River, Distric of Kumai, Regency of Kotawaringin Barat, Central Kalimantan.
Sinarmas MSIG Tower 9th Floor
Jl. Jend. Sudirman Kav. 21,
Jakarta 12930, Indonesia
Tel: +6221 8051 1130
Fax: +6221 8051 1135